Risk assessments, JSAs and SWMS
Who this is for: supervisors, managers and company admins. Guards read the documents that are issued to them (see Signing a safety document). Needs: the Safety module switched on for your company, and permission to manage safety documents at your sites. Approving a high-risk document needs a manager or company admin.
There are three kinds of document:
| Type | What it covers |
|---|---|
| Risk assessment | The hazards of a site, area or activity |
| JSA (job safety analysis) | The hazards and controls for one job |
| SWMS (safe work method statement) | A job's task steps, with extra details such as high risk work categories, plant and licences |
Create a document
- Open Safety from the sidebar (the Safety group).
- Select New document.
- Choose the Type: Risk assessment, JSA or SWMS.
- Choose the Site, enter a Title, then fill in the other details:
- For a JSA: Contractor and Location. For a SWMS: Employer (PCBU).
- Area or activity (optional) and a description.
- Assessed on and Review by dates.
- Select Create risk assessment, Create JSA or Create SWMS.
The document starts as a Draft and gets a number such as RA-0001. Your company can choose the numbering format.
Create a JSA or SWMS from a risk assessment
Open the risk assessment and select Create a JSA from this assessment or Create a SWMS from this assessment. Choose which hazards to carry over. Their risk levels and controls are copied, and you can edit them. The JSA stays linked to its assessment, and is flagged if the assessment changes.
Build the content
Open the document. The editor is made up of tasks, each with hazards, and each hazard has control measures.
- Select Add task and enter a Task or activity, for example "Gate access control".
- In the task, select Add hazard and describe the Hazard.
- Score the hazard twice, once before controls (inherent) and once after (residual). For each, choose a Likelihood (Rare, Unlikely, Possible, Likely, Almost certain) and a Severity (Insignificant, Minor, Moderate, Major, Catastrophic). The score shows live, and the Risk matrix marks the inherent and residual positions.
- Select Add control to add Control measures, strongest first. Give each a Control level: 1 Elimination, 2 Substitution, 3 Isolation, 4 Engineering, 5 Administrative or 6 PPE.
- Enter the Responsible parties.
- Select Save changes. The page shows Unsaved changes until you do.
If a hazard uses only administrative controls and PPE, Aegent shows No higher-order control considered as a nudge to look at stronger options.
To start from earlier work, choose Add from the library… to add a saved task with its hazards and controls. Tasks you type in that aren't in the library are added to it when you save.
Approval for high-risk documents
If a document's highest residual risk is High or Extreme, it can't be made current until a manager approves it. The page shows Needs approval. A manager or company admin selects Approve high residual risk.
Make it current
When you're ready, select Make current. A current document can be issued to people and appears in the risk register. For high-risk documents, the button is disabled until approved.
Making an assessment current also raises an action for each hazard with a High or Extreme residual risk, due in 30 days (7 days and urgent for Extreme). See Actions.
Other buttons on the page: Return to draft, Archive and Restore as draft.
Changing a current document
You can edit a current document, but Aegent keeps the old version and starts a new one. Anyone who signed the old version is asked to sign again. Earlier versions are listed under Earlier versions.
Review dates and PDFs
- Documents show Review due soon or Review overdue against the Review by date. Owners are reminded 30 days before, 7 days before, and when it is overdue.
- Select Download PDF to get a printable copy.
The task library
Task library (in the Safety group) holds the tasks, hazards and controls you've reused. The library is kept per client. Use Client to switch, and Show for Active or Archived tasks. On a task you can Rename, Archive or Restore it, and copy it to another client or to Every client.